Our company has been engaged in the past and is also presently engaged in Telecommunications Equipment installation and maintenance works (DC Power Supplies) by numerous manufacturers ( AEG – SAFT – AREVA- ELTEC- EMERSON) and at several ratings, i.e. 2,5KW-6KW-7,8KW-13KW-20KW-30KW-50KW which are installed to cover the needs of several telecommunication companies, at base stations and at their telecommunications exchanges.
In further detail:
• Installation, maintenance and upgrade of power supply systems (-48V DC/1125 A) for M.T.X operated by VODAFONE.
• Installation, maintenance and upgrade of power supply systems (-48V DC/3000 A) for M.T.X operated by WIND.
• Upgrade of power supply systems (2,5KW-6KW-7,8KW-13KW-16KW-ELTEC) installed all over Greece at several sites operated by VODAFONE.
• Installation of power supply systems (2,5KW-7,8KW) all over Greece at several sites operated by QUEST.
• Installation of power supply systems (2,5KW-7,8KW) all over Greece at several sites operated by WIND – COSMOTE companies.
• Installation, maintenance and repair of automation devices for generating sets (GS) at several sites by QUESΤ.
• Installation of a EMERSON power supply system to supply power to a 4G telecommunications cubicle.
• Repair and maintenance of power supply systems for INTRAKAT company.
• Design, construction and sale of a standard DC power consumption meter (ΚWh) for HELLAS ONLINE operator.